SureVoid® Corrugated Paper Void Forms |
|
Product: SlabVoid® System
|
| Illustration 1 - Drilled pier and trenched beam construction showing SlabVoid on top of elevated dirt pads, prior to the placement of a structural monolithic slab. |
|
|
|
| Illustration 2 - SlabVoid placed directly on the ground to form a waffled slab construction. |
|
|
|
| Illustration 3 - Layered SlabVoid placed in opposite directions to achieve various void depths. Open ends should be sealed with end caps to prevent concrete from flowing into the void. |
|
|
|
| Illustration 4 - Illustration of SlabVoid used in conjunction with other system components. |
|
|
|
|
|
|
J D Edwards
Corporate Campus Englewood, CO 27,000 sq ft |
|
Sewer Treatment Plant
Thornton, CO 9,000 sq ft - 36" thick slab |
|
Ice Arena
Westminster, CO 19,000 sq ft |
|
High School
Burleson, TX 240,000 sq ft |
Benefits of SlabVoid® Products
|